RFQ desk

Contact engineering sales for production line RFQ review.

Share the vehicle program, production process, country, capacity target, SOP timing, and current project stage so engineering sales can route the inquiry correctly.

Vehicle type and factory countryTarget capacity or takt requirementWelding, conveyor, assembly, testing, or fixture scopeNew plant, retrofit, launch, or productivity improvement stage
Robot welding equipment for automotive production line inquiry
Engineering review contextProduction line, welding fixture, conveyor, robot workstation, testing, and custom automation projects.
Context carried into RFQ
Source
products-bottom

RFQ / engineering sales

Share vehicle type, line scope, country, capacity target, SOP timing, and current project stage.

01 Vehicle program02 Process scope03 Engineering review
Contact
Production line scope
Requirement
Vehicle programsBus / car / truck / CKD / SKD
Review scopeLine layout, equipment modules, capacity target
RoutingEngineering sales + technical team

01 / Inquiry routing

A useful RFQ starts before the message box

01

Program

Vehicle type, country, plant stage, and target capacity.

02

Scope

Welding, conveyor, fixture, assembly, testing, robot, or custom equipment.

03

Review

Engineering sales routes the inquiry to the right technical team.

02 / Contact channels

Engineering sales contact

What to include

Faster replies start with useful line context.

  • Vehicle type: bus, coach, passenger car, cargo van, pickup, heavy truck, CKD, or SKD.
  • Line scope: welding, conveyor, painting, final assembly, testing, fixture, robot workstation, or custom equipment.
  • Project context: country, target capacity, existing plant or new plant, target SOP date, and current bottleneck.

Direct contact

Email, phone, and WhatsApp context

info@duoyuan.cn

400-666-1196

Zhengzhou Auto Industry Park, South Section of Xihuan Road, Zhongmu County, Zhengzhou, China

Use the form below for WhatsApp, email, and project context. Include drawings, target line output, equipment list, or current production constraints when available.