Scope
Qihang commercial vehicle final assembly line project covering 53 equipment items, 8 robot welding workstations, 16 process trolleys, 30 AGVs, and a 3,000-unit annual capacity target.
China / Commercial vehicle final assembly line
Qihang commercial vehicle final assembly line project covering 53 equipment items, 8 robot welding workstations, 16 process trolleys, 30 AGVs, and a 3,000-unit annual capacity target.

Project record
Qihang commercial vehicle final assembly line project covering 53 equipment items, 8 robot welding workstations, 16 process trolleys, 30 AGVs, and a 3,000-unit annual capacity target.
DUOYUAN delivered the Qihang commercial vehicle final assembly line project as a coordinated equipment package, connecting robot welding workstations, process trolleys, AGV logistics, line-side equipment, and acceptance management.
The 2020 project was recorded with final acceptance in a two-month period and is related to the CRRC dump truck welding case as a separate special-vehicle welding reference.
Project data
Case study
The Qihang commercial vehicle final assembly line project is a 2020 contract-level equipment reference in China. It is related to the CRRC dump truck welding case as a separate special-vehicle welding reference. The project is useful for buyers because it gives concrete planning numbers: 53 equipment items, 8 robot welding workstations, 16 process trolleys, 30 AGVs, and a 3,000-unit annual capacity target. The robot number is intentionally written as workstations, not converted into robot units, because the contract confirms workstation count.
The Qihang commercial vehicle final assembly line project needed a coordinated equipment delivery scope. The RFQ risk was not a single machine selection issue, but the coordination of equipment packages, robot welding workstations, process trolleys, AGV logistics, and final acceptance.
DUOYUAN connected commercial vehicle final assembly equipment, robot welding workstation planning, process trolley flow, AGV logistics, and acceptance management into one project boundary. This makes the project useful for RFQs that must coordinate line equipment, workstation planning, and factory logistics in one acceptance plan.
DUOYUAN organized the contract as 53 equipment items across the assembly and welding integration scope. The delivery record names 8 robot welding workstations, 16 process trolleys, 30 AGVs, a 3,000-unit annual capacity target, and a two-month period through final acceptance.
The contract record supports three citable facts: the Qihang commercial vehicle final assembly line project was recorded in 2020; the scope included 53 equipment items with 8 robot welding workstations, 16 process trolleys, and 30 AGVs; and the project targeted 3,000 units per year with final acceptance in two months.
Project review notes
Qihang Commercial Vehicle Final Assembly Line Project should be read through the vehicle type, line scope, equipment boundary, and launch result. You can compare this case with the related equipment before deciding whether the RFQ is for a complete line, one process section, or a retrofit package.
Start with Body-in-White Welding Line, then use the related reading below to prepare vehicle data, layout constraints, capacity targets, and commissioning expectations.
Project photos

Qihang commercial vehicle final assembly line project
Related products
Flexible body-in-white welding line for automotive body assembly, covering jigs, robot workstations, transfer equipment, body off line, main welding, and high-robot-count commissioning support.
ViewProduction LinesCommercial Vehicle Production LineCommercial vehicle production equipment for truck, cargo van, pickup, and heavy vehicle programs, covering welding, frame and chassis handling, assembly fixtures, conveyor systems, and testing.
ViewTesting and Custom EquipmentRobot Welding WorkstationRobot welding station layout, tooling, safety, programming support, and production acceptance for vehicle body projects.
ViewProduction LinesVehicle Conveyor and Transfer SystemAutomated body, chassis, skid, aerial, and storage conveyor systems for production flow and logistics control.
ViewRelated cases
Related reading
Workshop layout, equipment scope, local installation, and trial operation decisions for CKD/SKD projects.
Read guideguide / Conveyor & EMS / Slide TransportEMS vs Skid Conveyor in Vehicle AssemblyHow EMS, skid conveyor, slide transport, and storage systems fit different vehicle assembly line problems.
Read guidetechnical / Equipment Guides / EOLEnd-of-Line Verification for Vehicle AssemblyA production-minded view of alignment, rain testing, dimensional inspection, and release checks.
Read guideguide / Welding & BIW / Equipment GuidesHow to Choose Welding Fixtures for Vehicle Body ProductionHow you should evaluate welding fixtures, assembly jigs, locating, clamping, changeover, tryout, and commissioning support.
Read guideFAQ
Qihang Commercial Vehicle Final Assembly Line Project is published as a China reference for Commercial vehicle final assembly line. The visible scope is Qihang commercial vehicle final assembly line project covering 53 equipment items, 8 robot welding workstations, 16 process trolleys, 30 AGVs, and a 3,000-unit annual capacity target., with the reported result: The 2020 project was recorded with final acceptance in a two-month period and is related to the CRRC dump truck welding case as a separate special-vehicle welding reference..
Use this case to compare the line boundary, vehicle program, equipment families, and acceptance target before asking for a similar solution. A buyer should still provide workshop layout, capacity, SOP timing, and local installation conditions.
The page connects this reference with Body-in-White Welding Line, Commercial Vehicle Production Line, Robot Welding Workstation. DUOYUAN can review whether the RFQ needs a complete line package, a single process section, or a retrofit around these equipment families.
Inquiry
Request a quote