Shacman Automobile Military Truck Cab Welding Production Line

           The welding line can meet the production cycle of ZGJ cab assembly, and meet the relevant technical requirements of the production process and quality of cab assembly products. ZGJ cab is mainly divided into: floor assembly, left/right side panel assembly, rear panel assembly, top cover assembly, front panel upper plate assembly, front panel lower plate assembly, left/right door assembly, The tray and bumper assembly has nine parts. In order to meet the requirements of the inside and outside welds of the cab of the heavy-height cab (including the upper and lower plates of the front panel, the side panel and the front and rear panels, the side panel and the floor, the rear panel and the floor) and the outer welds (including Welding seam between upper and lower panels of front wall, welding seam between side wall and front and rear wall, welding seam between side wall and roof, welding seam between rear wall and roof, welding seam between front wall and roof Two sets of robot welding workstations are arranged at the 30-station and 50-station positions.

zhengzhou duoyuan Automobile Equipment Co., Ltd.

 

 

Get in touch