Higer Bus Production Line Project
We help Higer Bus successfully build bus welding line, bus assembly line and bus testing line.
View Details
-
Nanchong GEELY Bus Production Line Project
We help GEELY Bus successfully build bus welding line, bus assembly line.
View Details
-
Isuzu Pickup Truck Frame Welding Production Line
The RG09 (T17) frame welding line construction project is a remarkable achievement, successfully enabling the flexible co-production of new models, existing models, and partially expanded models.
View Details
-
Chengdu Yinlong Bus Project
Yinlong Bus have 4 factories including Nanjing Yinlong, Chengdu Yinlong, Tianjin Yinlong, Luoyang Yinlong. The welding and assembly line are all designed and manufactured by Duoyuan.
View Details
-
CRRC Dump Truck Welding Production Line
This dump truck welding production line is a benchmark factory of CRRC. The entire line realizes automatic conveying, stable conveying and accurate positioning. More than 20 arc welding robots are used in the entire production line.
View Details
-
CRRC Robotic Spot Welding Project
Robotic spot welding of roof skin.This system is an automatic spot welding workstation for the top skin, which is used to realize the automatic welding of the top skin. The equipment is equipped with two robot. Each side has a seventh-axis slide table.
View Details
-
Foton Heavy-Duty Truck EMS System
Foton Heavy-Duty Truck EMS System
View Details
-
Qatar Bus Production Line Project with Annual Output of 1000 Sets
In 2020, DUOYUAN proudly received a world-class project to construct an automotive production line in Qatar with an annual output of 1000 new energy buses. These buses will be utilized to accommodate visitors from around the world during the “2022 FIFA World Cup in Qatar”. New energy bus production line On November 28, 2020, and March 20, 2021, DUOYUAN dispatched two batches of skilled personnel to the project site in Qatar. Despite the challenging circumstances posed by the pandemic, our primary focus was to install and commission the equipment of the bus production line that had previously arrived at the site. Once completed, this production line will have the capacity to manufacture 1000 buses per year. The world will witness China’s contribution to public transportation during the 2022 FIFA World Cup, marking a significant milestone for DUOYUAN. Equipment shipment This remarkable project highlights DUOYUAN’s commitment to expanding its global presence. As we gradually make our mark on the world stage, we are proud to contribute to major international events and showcase our advanced manufacturing capabilities. With our dedication to excellence and continuous pursuit of innovation, DUOYUAN is poised to become a leader in...
View Details
-
Shacman Automobile Military Truck Cab Welding Production Line
The welding line can meet the production cycle of ZGJ cab assembly, and meet the relevant technical requirements of the production process and quality of cab assembly products.
View Details